Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 7 results ...

Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(01), 62-76.

Carreira, P, Castelo, T, Gomes, C C, Ferreira, A, Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users' perceptions. Engineering, Construction and Architectural Management, 25(01), 90-112.

  • Type: Journal Article
  • Keywords: information systems; simulation; integration; decision support systems; information and communication technology applications
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-09-2016-0198
  • Abstract:
    Purpose The purpose of this paper is to explore the use of virtual reality environments (VRE) for maintenance activities by augmenting a virtual facility representation and integrating relevant information regarding the status of systems and the space itself, while providing simple ways to control them. Design/methodology/approach The research focuses in the implementation of a VRE prototype of a building management system using game engine technologies. To evaluate the prototype, a usability study has been conducted that contrasts the virtual reality interface with a corresponding legacy application showing the users perception in terms of productivity improvement of facilities management (FM) tasks. Findings The usability tests conducted indicated that VREs have the potential to increase the productivity in maintenance tasks. Users without training demonstrated a high degree of engagement and performance operating a VRE interface, when compared with that of a legacy application. The potential drop in user time and increase in engagement with a VRE will eventually translate into lower cost and to an increase in quality. Originality/value To date no commonly accepted data model has been proposed to serve as the integrated data model to support facility operation. Although BIM models have gained increased acceptance in architecture engineering and construction activities they are not fully adequate to support data exchange in the post-handover (operation) phase. The presented research developed and tested a prototype able to handle and integrate data in a flexible and dynamic way, which is essential in management activities underlying FM.

Gerbov, A, Singh, V and Herva, M (2018) Challenges in applying design research studies to assess benefits of BIM in infrastructure projects: Reflections from Finnish case studies. Engineering, Construction and Architectural Management, 25(01), 2-20.

Hatamleh, M T, Hiyassat, M, Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(01), 113-31.

Lian, J K M, Foo, Z Y and Ling, F Y Y (2018) Value of internships for professional careers in the built environment sector in Singapore. Engineering, Construction and Architectural Management, 25(01), 77-89.

Lingard, H, Blismas, N, Harley, J, Stranieri, A, Zhang, R P and Pirzadeh, P (2018) Making the invisible visible: Stimulating work health and safety-relevant thinking through the use of infographics in construction design. Engineering, Construction and Architectural Management, 25(01), 39-61.

Ma, L, Reed, R and Jin, X (2018) Identify the equilibrium of residential construction output: A vector error correction model approach. Engineering, Construction and Architectural Management, 25(01), 21-38.